EasyManua.ls Logo

Tektronix DPO5000 Series - Page 257

Tektronix DPO5000 Series
352 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Disconnect the hookup:
a. Disconnect all test equipment from the instrument.
b. Set the instrument controls:
From menu mode, touch Utilities and select External Signals.
Touch the Internal button to select the internal reference.
c. Perform a signal path compensation:
Touch Utilities and select Instrument Calibration.
Touch Run SPC (Calibrate on some instruments) and wait for the
signal path compensation to finish.
Performance verification (MSO/DPO70000C, MSO/DPO70000DX, and DPO7000C series)
MSO70000C/DX, DPO70000C/DX, DPO7000C, MSO5000/B, DPO5000/B Series 245

Table of Contents

Other manuals for Tektronix DPO5000 Series

Related product manuals