EasyManua.ls Logo

TermoPool AIC06 - 2.2.2. Heat pump installation; 2.2.3. Wiring & protecting devices and cable specification

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Above data is subject to modification without notice.
2.2.2. Heat pump installation.
The frame must be fixed by bolts
foundation must be solid; the bracket must be strong enough and anti
The heat pump needs a water pump
specification-
flux: refer to Technical Parame
When the heat pump is running, there will be condensation water discharged from the bottom,
please pay attention to it. Please insert the drainage tube(accessory) into the hole and clip it well,
then connect a pipe to drain off the cond
2.2.3. Wiring & protecting devices and cable specification
Connect to appropriate power supply, the voltage should comply with the rated voltage of the
products.
Well earth the heat pump.
Wiring must be connected by a professional techni
Set breaker or fuse according to the local code (leakage operating current
The layout of power cable and signal cable should be orderly and not affecting each other.
UNIT=MM
MODEL
AIC06
AIC08
AIC10
AIC12
AIC13
AIC17
AIC21
AIC28
AIC28T
AIC35T
11
Above data is subject to modification without notice.
The frame must be fixed by bolts
(M10)
to concrete foundation or brackets. The concrete
foundation must be solid; the bracket must be strong enough and anti
-
The heat pump needs a water pump
(Supplied by the user)
. The recommended pump
flux: refer to Technical Parame
ter, Max. lift ≥10m
When the heat pump is running, there will be condensation water discharged from the bottom,
please pay attention to it. Please insert the drainage tube(accessory) into the hole and clip it well,
then connect a pipe to drain off the cond
ensation water.
2.2.3. Wiring & protecting devices and cable specification
Connect to appropriate power supply, the voltage should comply with the rated voltage of the
Wiring must be connected by a professional techni
cian according to the circuit diagram.
Set breaker or fuse according to the local code (leakage operating current
The layout of power cable and signal cable should be orderly and not affecting each other.
A B C D E F
315 590 312 340 961 250
315 590 312 340 961 250
315 590 312 340 961 280
315 590 312 340 961 280
315 590 312 340 961 340
395 590 392 420 961 390
395 590 392 420 961 460
395 720 392 420 1092 620
395 720 392 420 1092 620
505 790 496 530 1161 650
Above data is subject to modification without notice.
to concrete foundation or brackets. The concrete
-
rust treated;
. The recommended pump
When the heat pump is running, there will be condensation water discharged from the bottom,
please pay attention to it. Please insert the drainage tube(accessory) into the hole and clip it well,
Connect to appropriate power supply, the voltage should comply with the rated voltage of the
cian according to the circuit diagram.
Set breaker or fuse according to the local code (leakage operating current
≤ 30mA).
The layout of power cable and signal cable should be orderly and not affecting each other.
G H
74 658
74 658
74 658
74 658
74 658
74 658
74 758
74 958
74 958
74 958