31
PROBE - S
MOOTH: off?
- Surf corr: 00 %? (for probe 1 and 2!)
- Adjustments: ok?
- Calibration: necessary?
- Scaling: ok?
If you are unsure, you can reverse all probe configurations to the factory
settings via PROBE - R
ESET.
- SPECIAL - P
ARAMETER: Update altitude (Abs. Alt.) and pressure values
(barometric and differential pressure) if a pressure-
dependent humidity parameter (e.g. g/kg) is logged.
- INSTRUMENT - D
ATE/TIME: Current time?
-A
UTO OFF: Off?
-U
NITS: Humidity: g/kg?
-POWER: Sufficient?
- PRINT - PRINTER TYPE: Attachable printer?
2) Programming the measurement:
Call up the main menu with . Set up the measuring cycle and start and end conditions in the
MEMORY - PROGRAM sub-menu, e.g. starting time 16:00, 05.01.1998.
Select the values with . Increase or decrease values with or
.
Press to start. For example, the measuring cycle is defined with 30 s. The unit (h, min, s) can
be changed with the function buttons. End with . Define the duration of automatic storing
under the menu item “End”: e.g. number of measured values. If “100” is input the measuring
instrument stores 100 value sets per humidity probe (°C, %RH respectively and e.g. °C td
depending on selection). The measurement takes 50 min (= 2 value sets per minute) and ends at
16:50.
Automatic storing