EasyManua.ls Logo

Texecom CAPTURE P15 - 2.0 Variants; 2.1 CAPTURE P15

Texecom CAPTURE P15
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INS878EN-2 31/68
Resistance & voltage readings
Resistance and voltage readings should be recorded at the time of installation.
Voltage readings should be taken at the device
Resistance reading should be taken at the CIE or ACE where the circuit is
terminated.
2.0 Variants
2.1 CAPTURE P15

Related product manuals