Installation Manual
Ingersoll Rand’s Climate Solutions sector delivers energy-efcient HVACR solutions for
customers globally. Its world class brands include Thermo King, the leader in transport
temperature control and Trane, a provider of energy efcient heating, ventilating and air
conditioning systems, building and contracting services, parts support and advanced controls
for commercial buildings and homes.
©2011 Ingersoll-Rand Company
Printed in U.S.A. on Recycled Paper
Truck Edition (TSA, EMEIA and AP)
Single Temperature Systems
T-580R, T-800M and T-1000M (with TSR Controller)
T-680S, T-880S, T-1080S (with SR-3 Controller)
T-600R, T-680R, T-800R, T-880R, T-1000R & T-1080R (with SR-3 Controller)
T-1200R (EMEIA Only with SR-3 Controller)
TK 55212-1-IM (Rev. 4, 01/15)
Question and Answer IconNeed help?

Do you have a question about the Thermo King T-880R and is the answer not in the manual?

Thermo King T-880R Specifications

General IconGeneral
BrandThermo King
ModelT-880R
CategoryAir Conditioner
LanguageEnglish

Summary

Safety Precautions and Warnings

General Safety Warnings and Precautions

Covers critical safety advisories including dangers, warnings, and cautions for installation and operation.

Battery Installation and Cable Routing Safety

Guidelines for safe battery installation, cable routing, and handling to prevent fire or explosion.

Refrigerant Handling and First Aid

Precautions for handling refrigerants and first aid measures for exposure.

Refrigeration Oil Safety and First Aid

Safety advice and first aid procedures for contact with refrigeration oil.

Truck Body Requirements

Lifting and Handling Procedures

Lifting Bar Details and Safety Warnings

Provides essential information and safety warnings regarding the required lifting bar for unit installation.

Tools and Components for Installation

Unit Preparation and Installation

Uncrating the Unit Safely

Step-by-step instructions for carefully removing the unit from its shipping crate.

Installing the Unit onto the Truck Box

Procedure for physically mounting the unit into the truck body opening using lifting bars and bolts.

Fuel System Installation

Installing the Fuel Pump and Fuel Lines

Guidance on installing the fuel pump and routing fuel supply and return lines to the tank and unit.

Battery Installation and Connections

Connecting the Battery Cables

Detailed steps for connecting positive and negative battery cables and the unit control power wire.

Optional Accessory Installation

Final Checks and Commissioning

Unit Pre-Operation Check List

Checklist for visually inspecting the unit and its components before starting operation.

Unit Operational Check List (Continued)

Comprehensive checklist for operational checks, including multi-temp units, electric standby, and final stop procedures.