Do you have a question about the Thermo Pride OL16-125 and is the answer not in the manual?
Defines terminals and field wiring for burner, thermostat, and ECM controls.
Illustrates blower wiring and switch configurations for the unit.
Details power supplies, limit switch, and thermostat/humidistat inputs.
Describes ECM control outputs, oil burner control, and power outputs.
Explains the different operational states of the ECM blower system.
Control waits for thermostat demand; outputs are off.
Blower operates at low speed on a 'G' call from thermostat.
Blower ramps up to cool speed, energizes CC terminal on 'Y' call.
Blower speeds reduce during cooling mode for dehumidification.
Prevents compressor short cycling by ignoring cooling calls for 4 minutes.
Blower on delay starts, ramps up to speed on 'W' call.
Describes how blower speeds are selected for G, W, and Y calls.
Table showing cooling speeds and CFM for different SW1 switch settings.
Table showing heating speeds and temperature rise for SW1 settings.
Describes status LEDs on the control board for diagnostics.
Provides general guidelines and common symptoms for troubleshooting ECM motors.
Covers noise, moisture issues, general advice, and specific checks for ECM motors.
This document is an ECM (Electronically Commutated Motor) Operation Manual for Thermo Pride furnaces, specifically for models OL16-125, OL20-151, and OH16-125. It provides detailed information on the blower controller, wiring, operating modes, CFM tables, replacement parts, and troubleshooting.
The ECM blower controller manages the operation of a multiple-speed ECM motor, which is responsible for circulating air in the furnace for heating, cooling, and fan-only modes. The control board receives inputs from the thermostat, humidistat, and limit switch, and based on these inputs, it regulates the blower speed and other furnace components.
| Brand | Thermo Pride |
|---|---|
| Model | OL16-125 |
| Category | Furnace |
| Language | English |












Loading...