EasyManua.ls Logo

Thermo Scientific ModulyoD - Page 3

Thermo Scientific ModulyoD
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of Contents
Section Section Title — Installation Page
3.0 Installation 15
3.1 Unpack and Inspect 15
Table 3- Checklist of Components 15
3.2 Site Preparation 15
3.3 Connect the ModulyoD to the Electrical Supply 16
3.4 Connect the Vacuum Pump 16
3.5 Connect a Vacuum Pump to the ModulyoD 16
Figure 9-Connect a VLP195FD or VLP120 Pump to the ModulyoD 17
3.6 Pump Outlet Safety 17
3.7 Test After Installation 17-18
Section Section Title — Operation Page
4.0 Operation 19
4.1 Safety 19
4.2 Sequence of Operation 19
Table 4-Sequence of Operation 19
4.3 Prepare the ModulyoD 20
4.4. Fit the Sample Container and Other Accessories 20
4.5 Pre-Cool the ModulyoD 20-21
4.6 Drying 21-22
4.7 Shut Down 22
4.8 Defrost the ModulyoD 23
4.9 Operation With No Load 24
Section Section Title — Maintenance Page
5.0 Maintenance 24
5.1 Safety 24
5.2 Precautions 24
5.3 Refrigerant Leaks 25
Section Section Title — Accessories Page
6.0 Accessories/Drying Accessories 25
Section Section Title — Warranty & Appendices Page
7.0 Warranty and Liability 26
Appendix A - Using the ModulyoD as a Cold Trap 26
Appendix B - Decision Tree 27
Freeze Drying User’s Log 28
3

Related product manuals