EasyManua.ls Logo

Thor Kitchen HRD Series - Step 3; Step 4

Thor Kitchen HRD Series
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
55
Here’s the procedure to have Customer/Servicer check the condition for our current burner design.
The procedure helps the electrode to sense the flame correctly:
Step 3
For the flame ring base part. make sure
that the electrode will go through the
hole on the 10 o’clock position. Make
sure the electrode is not going through
the hole next to the cross-over.
Step 4
Make sure the electrode is vertical to
the surface of the burner base. Please
be notified that there’s a slot at the 8
o’clock position of the burner base.
This slot helps to locate the burner
base.

Table of Contents