EasyManua.ls Logo

Thule TB60 - Installation Steps; Marking Track Holes; Drilling Pilot Holes; Drilling Final Holes

Thule TB60
3 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Starting at either end of the track, mark the end hole using a fine tip marker, and continue to
mark every other hole on the track.
2
Remove the tracks
from the roof.
3
Using the
7
32" drill bit supplied, drill
a hole into each of the pilot holes.
Carefully blow away debris.
5
Remove backing from the self adhesive washers and apply to the bottom of the track.
Only place washers on holes that line up with the holes drilled in the roof.
6
Using the
1
8" drill bit supplied, drill a
pilot hole in the center of each of the
marks.
4
Apply silcone into each hole.
7
With end caps inserted into
track, position track over the
holes and install screws at front
and rear.
8
W
ear safety glasses
during installation.
W
ear safety glasses
during installation.

Related product manuals