EasyManua.ls Logo

ThyssenKrupp DAF 380 - DAF290 Commissioning Checklist

ThyssenKrupp DAF 380
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING MANUAL DAF290 MACHINE SETUP
ThyssenKrupp Aufzugswerke GmbH
5.1 Commissioning
Before commissioning the machine, the following points should be checked
and carried out:
Safety, auxiliary and installation tools removed from the danger zone
Setup and alignment of machine, frame and rope departure checked
Mounting of the machine and base frame checked
Bolts tightened and secured to the prescribed torque (see 'Tightening
torques' table in the Appendix)
Brake shoe stroke and setting checked
Setting and function of the brake test switches checked
Brake test carried out with one brake shoe in each case
Function of handbrake release checked
Rope protection cover fitted, function of safety shutdown device on
removing the traction sheave hood checked
Power connections, earthing of motor, forced ventilation and brake magnet
connected, checked and secured
Special add-on components (optional), 2nd pulse encoder function
checked
Direction arrow (Up / Down) corresponding to the direction of travel glued
in a clearly visible position above the traction sheave to the brake vane
magnet
18
10-2012
Product has been
replaced

Related product manuals