EasyManua.ls Logo

Tiger Delta - Step 6: Continue to Build Walls

Tiger Delta
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TIGER DELTA LOG CABIN GENERAL INSTRUCTIONS
Step 5:
SECURING FLOOR
• Checkoorboardsarecorrectsize.Donotmixupwithroofboards.
• Lay5oorboardsinposionandtackinplace.Leaveapprox.2.5mmgapbetweentheedgeoftheoorboards
andtheinsideofexternalwalls.
(Detail E)
NOTE: DO NOT FULLY SECURE AS THESE ARE ONLY TO KEEP THE FLOOR SQUARE WHILE BUILDING
THE LOG CABIN.*
• *Forcabinswithinternalparon,theoorboardswillneedtobefullyinstalledatthisstagetoallowparon
baselogstobeinstalled.PleasejumptoStep14fordetails.
E
Step 6:
CONTINUE TO BUILD WALLS
• Usingconstructdiagramasaguide,begintobuildupthewallsbyinterlockingthelogslayerbylayerunl
3logshigh.
• Atthispoint,storeremainingoorboardsinsidethecabinreadyforinstallaon.Youmaynotbeabletot
oorboardsthroughthedooroncecabinhasbeenbuilt.
10
gersheds.com 0113 205 4189 sales@gersheds.com

Related product manuals