EasyManua.ls Logo

Tiger SIBERIAN - Step 12: Felt the Roof; Felt Preparation and Cutting; Applying and Securing Roof Felt

Tiger SIBERIAN
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TIGER SIBERIAN LOG CABIN GENERAL INSTRUCTIONS
Step 12:
FELT THE ROOF - MEASURE AND CUT BEFORE INSTALLING FELT
• Rollfeltoutontoacleanatsurface30minutesbeforeyouneeditsoithasachancetoaenout.
• Measurelengthofroofandallow75mmoverhangateachend.Cuteachstripoffelttosize.
Useastraightedgetoguidecung.
• Rollcutfeltpiecealonglowsideofroof,Secon1,leavingsucientoverhangtofolddownontoroofedge.
Donotfoldunderneathroof.
(Detail J1 & J2)
• Oncefeltisrolledout,xtoroofusingCN20bothends,makingsurefeltisstraight.Securethroughskirng
usingCN20atapprox.100mmintervals.
(Detail J2)
Ensurethefeltisght,securethetopsideoffeltusingCN20atapprox.100mmintervals.(Detail J3)
• Repeatforremainingfelt,workingfromthelowsideofrooftothehighside,overlappingthefeltby75mm
unltheroofisfullycovered.
(Detail J3)
• Foldtheoverhangingfeltatendsunderroofboardandtackinplace.
J1 J2 J3
INCORRECT FELT CORRECT FELT
CN20
CN20
CN20
ROOF BOARD
14
gersheds.com 0113 205 4189 sales@gersheds.com
SECTION 1

Related product manuals