EasyManua.ls Logo

Tiger SIBERIAN - Step 13: Attach Roof Fascia Boards; Fascia Board Installation; Step 14: Lay Floorboards; Floorboard Laying and Nailing

Tiger SIBERIAN
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pleaseretaininstruconsforfuturereference
Step 13:
ATTACH ROOF FASCIA BOARDS (BARGEBOARDS)
• Aachrooffasciasusing4xN40perfasciaboard.Nailthroughtoppurlinandboomroofbaen.
Completethelookwithnialsoverthejoinatapex.Secureusing2xN40pernial.
NOTE: THERE ARE NO BARGEBOARDS SUPPLIED FOR LOW SIDE OF ROOF AS THIS WILL PREVENT
EFFECTIVE WATER DRAINAGE.
Step 14:
LAY FLOORBOARDS
• Starttolaytheoorboards.Thereshouldbea2.5mmgapbetweentheedgeoftheoorboardsandtheouter
logstoallowforexpansionandcontracon.
• Nailtheoorboardstothetanalisedbearersbelowwith2xBA40evenlyspacedperoorboardper
tanalisedbearer.
• Thelastboardwillneedcungdowntosize.Ifinstallinganyparons,pleasereturntoStep6.
FASCIA FASCIA
FINIAL
15
CUT FLOORBOARD TO SIZE

Related product manuals