(1) Check
Check the appearance of partial assembly and ensure whether it has flaw and damage, blade edge curl. If
has, just replace it.
(2) Assembly parts list
Ensure all parts without loss according to the explosive view.
(3) Assemble shaft end, spline shaft end, boot and blade
Install parts following the order from left to right or right to left, tighten bolt and nut. The both sides of shaft
end are installed priority then the blade.
PRODUCTS SPECIFICATIONS
www.tmgindustrial.com 9/35 Toll Free:1-877-761-2819