EasyManua.ls Logo

Topcon SL-3E - Checking Procedure

Topcon SL-3E
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
ASSEMBLY PROCEDURE
CHECKING PROCEDURE
(1) Power Plug
* Make sure that the instrument is always properly grounded.
(2) Illumination and Instrument Functions
* Turn the power supply on and observe that the illumination is passing through the opened slit
controls.
* Check to insure that the fixation device is illuminated.
* Check to see that the slit width and length controls, filter lever and magnification changer
lever operate smoothly and properly.
(3) After the installation is completed, turn the power supply off and cover the instrument
with the dust cover.