Chapter III
Operation Instruction
3.1 Equipment Operation Method
3.1.1 Equipment Operation Preparation
[1]: Firstly check whether the power switch is in the off state to ensure the safety.
[2]: As shown in the following Figure 1, firstly adjust the handle in the line-style, and then hold the location of the handle
designated by ② with one foot stamping on ① to press downwardly with strength; after the equipment is fixed in the post,
begin to check whether the external parts are complete, whether there are wrong installation, neglected installation and
loose parts. Immediately solve the problem when finding those phenomena.
[3]: After checking, make the equipment down until the chassis touch the ground, and lay it flatly.
[4]: Load the grinding material onto the equipment chassis, and the basic steps are shown in Figure 2:
(1) As shown in Figure 2-1, the equipment chassis is loaded with small black grinding head.
(2) As shown in Figure 2-2, paste the piece with nylon viscose cloth of the required water milling slice to the small
black grinding head, and paste one set of grinding slice onto the small black grinding head in sequence. Note: The
number of grinding slices in one set of process must be consistent.
(3) After well loading, check whether the parts are complete once again.
[5]: Install or tighten the handle, clockwise rotate the black rotary handle to the tightest state. Rotate in the reverse
direction when dismounting the handle as shown in Figure 3.
[6]: Pull the handle of the swing arm, adjust the handle to the height best suitable using the chuck as shown in Figure 4.
Figure 1 Figure 2
Figure 3 Figure 4