Equipment Maintenance and Overhauling
5.1 Maintenance and Overhauling
[1]: Make the working personnel check the grinding plate before using, if finds any loose of the grinding plate or the bolt,
please timely fasten the bolt and the nut for timely preventing uneven abrasion.
[2]: In the process of using this equipment to grind, the working personnel shall notice the loss of grinding material for
preventing the damage of grinding plate from it touching the ground.
[3]: When using, this machine can’t block the vent hole. When being blocked, timely clean it to ensure the normal
ventilation of the motor.
[4]: After 20 days in using, please clean the dust in the inverter and the vent hole, and the operation can be done after
trouble shooting. In case of dry grinding in non-vacuum cleaner connection, it need to clean the dust in the inverter every 2
days.
[5]: When conducting dry grinding with this equipment, it must be equipped with the vacuum cleaner.
[6]: Please replace the gear oil (150#) regularly. The new machine needs to replace the gear oil after grinding for about
1000m
2
, and once every 5 months after the run-in period.
[7]: Clean the external housing of this equipment after using every time in the premise of outage, and put it in dry and cool
place for next using, thus extending the service life.