Operation
Note:Theproceduresinthissectionshowa
machinewithaplasticcargobedandbucketseat;
foradditionalproceduresforotherattachments,
refertotheOperationsection(ifapplicable)inthe
InstallationInstructions.Visitwww.T oro.comforyour
instructionsorscantheQRcode(ifapplicable)on
yourattachment.
BeforeOperation
BeforeOperationSafety
GeneralSafety
•Neverallowchildrenorpeoplewhoarenottrained
orphysicallycapabletosafelyoperateorservice
themachine.Localregulationsmayrestrictthe
ageoftheoperator.Theownerisresponsiblefor
trainingalloperatorsandmechanics.
•Becomefamiliarwiththesafeoperationofthe
equipment,operatorcontrols,andsafetysigns.
•Shutoffthemachine,removethekey,andwait
forallmovementtostopbeforeyouleavethe
operator’sposition.Allowthemachinetocool
beforeadjusting,servicing,cleaning,orstoringit.
•Knowhowtostopandshutoffthemachinequickly.
•Ensurethattherearenotmoreoccupants(youand
yourpassenger(s))thanthenumberofhandholds
equippedonthemachine.
•Checkthatallsafetydevicesanddecalsarein
place.Repairorreplaceallsafetydevicesand
replaceallillegibleormissingdecals.Donot
operatethemachineunlesstheyarepresentand
functioningproperly.
PerformingDaily
Maintenance
ServiceInterval:Beforeeachuseordaily
Beforestartingthemachineeachday,performthe
EachUse/DailyprocedureslistedinMaintenance
(page28).
CheckingtheTirePressure
ServiceInterval:Beforeeachuseordaily
Frontandreartiresairpressurespecication:165
to207kPa(24to30psi)
Important:Donotexceedthemaximumair
pressureindicatedonthesidewallofthetire.
Note:Theairpressureneededinthetiresis
determinedbythepayloadthatyouintendtocarry.
1.Checktheairpressureinthetires.
•Uselowerairpressureinthetiresforlighter
payloads,forlesssoilcompaction,fora
smootherride,andtominimizetiremarkson
theground.
•Usehigherairpressureinthetiresfor
carryingheavierpayloadsathigherspeeds.
2.Ifnecessary,adjusttheairpressureinthetires
byaddingorremovingairinthetires.
g001055
Figure19
16