13
SETUP INSTRUCTIONS
FIG. 4
NOTE: If installing the "Enclosed Boom" option
in place of the Standard Boom, skip steps 7-
21. See Enclosed Boom instructions.
7. Position a Spacer Tube between the lugs on
each side of the Main Frame tube. Insert a 1/2" x
2-3/4" Grade 8 cap screw through the Boom
Support Strap, lugs and spacers. Secure the
Main Frame to the Boom Mounting Brackets with
flange nuts. Torque to 105 ft lbs. (142 N-m) (See
FIG. 5)
1. Spacer Tube 3. Boom Mounting Brackets
2. Main Frame Tube 4. Boom Support Strap
FIG. 5
8. Using a torque wrench, tighten the 1/2" x 18"
screw that joins the Wedges to the Boom Mounts.
Tighten to 50 ft. lbs (68 N-m).
9. Position the two (2) Center Boom angles on
the Main Frame and secure them to the Main
Frame Tube with two (2) square U-bolts, four (4)
flat washers and hex nuts. (See FIG. 6, page 14)
13. Place two (2) Hose Clamps on two (2) 3/4" x
19" Jumper Hoses and connect the two (2) "end"
Turret Bodies to the Double Barb Turret Body.
Space nozzles 20" apart and tighten fasteners
securely. Apply thread sealer and install 90° 3/4"
Hose Barb on the Threaded Turret Body. (See
FIG. 6, page 14)
14. Attach the two (2) Strut Assemblies to the
two (2) Adjustable Clevises found on each side
of the Main Frame tube with (2) 1/2" x 2" clevis
pins and two (2) 1/8" x 1" cotter pins. (See FIG. 6,
page 14)
3
1
1801
1. Boom Hold-In ASM 3. Mounting Bracket
2. Valve Mounting Bar 4. Control Valve ASM
4
2
10. Center and attach the Center Boom Pipe to
the two (2) Center Boom Angle with two (2)
clamps, (2) 3/8" x 1" cap screws, flat washers and
lock nuts. Once mounted, the Center Boom Pipe
should be approximately 20" from ground.
11. Loosely attach the Double Barb Turret Body
with the Turret Body Clamp in the approximate
center of the Center Boom Pipe. For the most
uniform spray coverage, position all Nozzles level
as shown in FIG. 6, page 14.
12. Loosely attach a Single Barb Turret Body
with the Turret Body Clamp to LH end of the
Center Boom Pipe. Loosely attach a threaded
Turret Body with the Turret Body Clamp to RH
end of the Center Boom Pipe.
1815-1
1. Mounting Brackets 2. Control Valve ASM
FIG. 3A
2
1
1
1897
6. Install the Control Valve Assembly to the Valve
Mounting Bar with three (3) 5/16" hex head cap
screws. (See FIG. 4)