EasyManua.ls Logo

Toro Workman 2110 - Starter;Generator

Toro Workman 2110
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Workman 1100/1110/2100/2110 Page 6 – 11 Electrical System
Starter/Generator
Testing of starter/generator field and armature windings
is difficult with the starter/generator still mounted in the
Workman. Follow the procedures for Starter Generator
& Voltage Regulator Component Testing prior to remov-
ing the starter generator for further testing and repairs.
Starter generator resistance tests are as follows:
NOTE: Prior to taking small resistance readings with a
digital multimeter, short the meter test leads together.
The meter will display a small resistance value (usually
0.5 ohms or less). This resistance is due to the internal
resistance of the meter and test leads. Subtract this val-
ue from the measured value of the component you are
testing.
1. Measure resistance (Ohms) between starter gener-
ator terminals DF and F1 (field). The meter reading
should be 5.5 to 5.9 Ohms.
2. Measure resistance (Ohms) between starter gener-
ator terminals A1 and A2 (armature). The meter reading
should be under 1 Ohm.
3. Measure resistance between each terminal (Fig. 12)
and ground. The meter reading should be infinite.
4. Starter/generator disassembly and repair will be
needed if readings are incorrect.
1. Starter/Generator end cover view
Figure 12
A1
A2
F2
F1
DF
Electrical
System

Table of Contents

Other manuals for Toro Workman 2110

Related product manuals