EasyManua.ls Logo

Toshiba RAS-18UAX - 7-2-3 Dry Operation

Toshiba RAS-18UAX
83 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FILE NO. SVM-02008
– 36 –
8-3. Installation
8-3-1. Optional installation parts
Air inlet
Drain outlet
<Fixing bolt arrangement of outdoor unit>
RAS-18UAH-E, RAS-18UA-E, RAS-18UAX, RAS-18UA-AR
Fig. 8-3-1
RAS-18UAX-T2, RAS-24UAH-E, RAS-24UA-E,
RAS-24UAX, RAS-24UA-AR, RAS-24UAX-T
Fig. 8-3-2
Part
Code
A
B
C
Q'ty
One
each
1
One
each
Parts name
Refrigerant piping
Liquid side : 6.35 mm
Gas side : 12.70 mm (RAS-18UF)
: 15.88 mm (RAS-24UF,
RAS-18UFPX-T2)
Pipe insulating material
(polyethylene foam, 6 mm thick)
Putty, PVC tapes
Air outlet
Air outlet
Drain outlet
Air inlet
Secure the outdoor unit with fixing bolts and nuts if the unit is likely to be exposed to a strong wind.
Use 8 mm or 10 mm anchor bolts and nuts.
If it is necessary to drain the defrost water, attach Drain nipple ! to the bottom plate of the outdoor unit
before installing it.
600 mm
325 mm
52 mm
120 mm
600 mm
340 mm
64 mm
120 mm

Table of Contents

Related product manuals