EasyManua.ls Logo

Toshiba Super MMY-MAP0801HT7 - Page 110

Toshiba Super MMY-MAP0801HT7
270 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
110
2. Test operation
Normal
START
Test operation for
all units in turn
Test operation for one indoor unit
Operate all the indoor units at once.
Operation start
Is cold air or hot air discharged?
(NOTE 1)
(NOTE 2)
(NOTE 3)
Is the temperature difference
between suction and discharge good?
Is the operating voltage correct?
(Rated voltage ±10%)
Refer to Test operation procedure of
indoor remote controller.
(NOTE)
After power-ON, it may require Max. 10 minutes
to start the operation due to the initial
communication of the system.
Check operation status of the compressor.
Is air circulation good?
Is the operating current normal?
Is the operating pressure normal?
Check direction of the flap.
Execute a test operation using
Function of start/stop the indoor unit from
outdoor unit in Service support function.
Check power voltage of the
main power supply.
Check cable size of the
power supply.
Check temperature load in indoor/outdoor.
Check pipe length and refrigerant amount.
Check operating Hz of compressor.
Check abnormal sound in outdoor unit.
(Abnormal sound, etc of compressor and others)
The operation does not start approx. 3 minutes
after power-ON or operation stop.
YES
YES
YES
YES
YES
YES
YES
YES
NO
NO
NO
NO

Table of Contents

Other manuals for Toshiba Super MMY-MAP0801HT7

Related product manuals