EasyManua.ls Logo

TotalGym PowerTower - Page 19

TotalGym PowerTower
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Folding
17
8. Push the glideboard and tower together until the unit stands vertical.
9. Lift the rail fold latch located on the hinge crossbar, and hook the rails to
the tower crosspin with the latch.
WARNING:
Lift only where indicated on the upper rail. Lifting elsewhere may
cause the rails to move up the tower during the folding process.
This will cause the tower to lean backwards excessively. If this
happens accidentally, straighten and lower the rails back to the
oor. Then start over. Or you can squeeze the release handle on top
of the tower and pull the tower forward.
6. Stow the handles so they are not damaged when storing
or moving your Total Gym
Figure 1:
Sport™ -Stow the handles on the
arms as shown below.
Figure 2:
GTS® - Loop the handle straps
around the opposite LAT bar pull pin
as shown below.
Figure 3:
PowerTower® - Hook the handles
together behind the back of the tower
as shown below.
7. Grasp the upper rail where indicated (on the label inside each of the upper
rails) and lift it toward the tower.
Grasp Here
Rail Fold Latch