EasyManua.ls Logo

TotalGym PowerTower - Folding Your Total Gym Unit; Folding Procedure Steps

TotalGym PowerTower
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Folding
16
4. Remove the folding foot holder and hook it on the back of the squat stand.
5. Lower the rails to lowest position “F”
Before folding, move the unit away from a wall or window because the tower
will lean back.
1. If LAT bars are installed on your model Total Gym®, move the pulleys to
the upper outside position as shown.
2. Remove the center pulley from the glideboard and hang it on the pulley
storage ring on the back of the tower transport handle.
3. Remove or fold down the squat stand against the glideboard by pulling the
squat fold pull pin on the left side of the lower rail while facing the tower.
Folding