Omada L2+ Managed Switch
18 Installation
enough to damage electronic devices, more effective lightning protection measures should be 
taken.
 ■
Ensure that the rack and the device are well earthed.
 ■
Make sure the power socket has a good contact with the ground.
 ■
Keep a reasonable cabling system and avoid induced lightning.
 ■
Use the signal SPD (Surge Protective Device) when wiring outdoor.
Note: 
For detailed lightning protection measures, go to https://www.tp-link.com/support, search the 
model number of your switch and go to the product Support web page, refer to the Lightning 
Protection Guide from the Related Documents:
https://www.tp-link.com/us/conguration-guides/lightning_protection_guide/.
Installation Site
When installing the device on a rack or a flat workbench, attach much importance to the following 
items:
 ■
The rack or workbench is flat, stable, and sturdy enough to support the weight of 5.5 kg at least.
 ■
The rack or workbench has a good ventilation system. The equipment room is well ventilated.
 ■
The rack is well grounded. Keep the device less than 1.5 meters away from the power socket.
2.3  Installation Tools
 ■
Phillips screwdriver
 ■
ESD-preventive wrist wrap
 ■
Cables
Note: 
These tools are not included with our product. If needed, you can purchase them separately.
2.4  Product Installation
 ■
Desktop Installation
To install the device on the desktop, follow the steps:
1.  Set the device on a flat surface which is strong enough to support the entire weight of the device 
with all fittings.
2.  Remove the adhesive backing papers from the rubber feet.