EasyManua.ls Logo

TP-Link T2600G-28TS - Chapter 3 Login to the Switch; 3.1 Login

TP-Link T2600G-28TS
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Gigabit L2 Managed Switch
Connection
4.5 Power On
Plug the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shows.
Figure 4-6 Connecting to Power Supply
Note: The gure is to illustrate the application and principle. The power cord you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the gure above.
4.6 Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond in the following order:
The PWR LED indicator lights on all the time. The SYS LED and the LED indicators of
all the ports keep off.
After about one minute, the SYS LED and LED indicators of all the ports will flash
momentarily and then turn off.
Several seconds later, the SYS LED indicator will flash, which represents a successful
initialization.
100-240V~50/60Hz 0.5A

Other manuals for TP-Link T2600G-28TS

Related product manuals