SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
June 2022
1188--BBCC111100DD11--11AA--EENN
Side Discharge HP Models
For coastal applications where units are installed within one (1) mile of salt water, epoxy coated models are recommended. These models
have an 8 week lead time after order.
EEppooxxyy CCooaatteedd MMooddeell
4TWL5024N1000A
4TWL5030N1000A
4TWL5036N1000A
4TWL5042N1000A
4TWL5048N1000A
4TWL5024N1COTA
4TWL5030N1COTA
4TWL5036N1COTA
4TWL5042N1COTA
4TWL5048N1COTA
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
Installer’s Guide
Question and Answer IconNeed help?

Do you have a question about the Trane Technologies 4TWL5036N1000A and is the answer not in the manual?

Trane Technologies 4TWL5036N1000A Specifications

General IconGeneral
Cooling Capacity36000 BTU/H
Voltage208/230V
Phase1
Refrigerant TypeR-410A
Unit Weight220 lbs

Summary

Installer's Guide and Model Overview

Initial Safety Warning

Critical safety notice regarding installation and service procedures.

Comprehensive Safety Precautions

Hazardous Voltage and Refrigerant Handling

Warnings for electrical hazards, refrigerant oil, and pressure.

Grounding, Brazing, and Chemical Exposure Warnings

Safety for grounding, brazing, and potential chemical exposure.

Unit Preparation and Pad Installation

Refrigerant Line and Factory Charge Details

Refrigerant Line Brazing Steps

Brazing Preparation and Execution

Steps for preparing and brazing refrigerant lines.

Refrigerant Line Brazing Completion

Brazing Valve Body Protection and Core Replacement

Protecting valves during brazing and replacing valve cores.

Refrigerant System Integrity Checks

Leak Check Procedure

Method for detecting leaks in the refrigerant system.

Evacuation Process and Standards

Steps for evacuating the system to remove moisture and air.

Service Valve Operations

Low Voltage Electrical Wiring

Low Voltage Thermostat Wiring

High Voltage Electrical Safety

High Voltage Power Supply Precautions

Safety guidelines for working with high voltage components.

High Voltage Disconnect and Grounding

Installation of disconnect switches and grounding requirements.

System Start-Up Procedure

Subcooling Charging Method for Cooling

System Charge Adjustment Calculations

R-410A Refrigerant Charging Chart

Subcool Charging Correction Charts

Finalizing Unit Charging

Installation Checkout Procedure Checklist

Troubleshooting Compressor Issues

Diagnosing Compressor Start Failures

Flowchart for troubleshooting compressor start problems.

Troubleshooting Compressor Operation

Diagnosing Compressor Not Running

Flowchart for troubleshooting compressor not running issues.