SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
June 2022
1188--EEBB4411DD11--11AA--EENN
Single Packaged Gas/Electric 15 SEER2 Convertible,
2 - 5 Ton, 60 - 115 KBTU, R-410A
4YCZ5024E1060A
4YCZ5036E1070A
4YCZ5036E1090A
4YCZ5048E1090A
4YCZ5048E1115A
4YCZ5060E1115A
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
NNoottee:: “Unit specific Service Facts available online.”
Installation and Operations Manual
Question and Answer IconNeed help?

Do you have a question about the Trane Technologies 4YCZ5036E1070A and is the answer not in the manual?

Trane Technologies 4YCZ5036E1070A Specifications

General IconGeneral
BrandTrane Technologies
Model4YCZ5036E1070A
CategoryAir Conditioner
LanguageEnglish

Summary

Safety Warnings

Hazardous Conditions

Covers hazards related to gases, voltage, grounding, refrigerant, and general safety.

Introduction and Specifications

Cooling Charging Procedure

Step-by-step guide for charging the system in cooling mode above 55°F OD.

Product Specifications

Unit Installation Requirements

Unit Installation Procedures

Rooftop Installation - Curb Mounting

Procedures for installing the unit on a roof curb.

Lifting and Rigging

Safety guidelines and procedures for lifting and rigging the unit.

Rooftop Installation - Frame Mounting

Instructions for installing the unit on a field-fabricated frame.

Rooftop Installation - No Curb/Frame

Procedures for rooftop installation using sleeper rails instead of a curb.

Gas Piping Installation

Detailed instructions and safety precautions for gas piping installation.

Manifold Pressure and Input Check

Steps for verifying and adjusting manifold pressure and checking gas input.

Electrical Wiring and Connections

Instructions for electrical wiring, connections, and power supply.

Disconnect Switch and Power Wiring

Requirements for disconnect switches, overcurrent protection, and power wiring.

Unit Startup and Operation

Pre-Start Checklist

A checklist to ensure all installation steps are completed before startup.

Pressure and Voltage Checks

Methods for checking operating pressures and voltage during cooling.

Sequence of Operation (Heating/Cooling)

Explanation of the unit's automatic heating and cooling operational sequences.

Maintenance and Service

Service Maintenance Procedures

Recommended service checks for cooling and heating seasons by qualified technicians.

Performance Data

Troubleshooting

Troubleshooting Chart

A chart listing system faults, primary/secondary causes, and troubleshooting steps.