EasyManua.ls Logo

Trane 4TWX8 - User Manual

Trane 4TWX8
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
18-BC91D1-6B-EN
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service informa-
tion pack upon completion of work.
Condensing Units
These instructions do not cover all variations in systems or provide for every possible contingency to be met in connection with
the installation. Should further information be desired or should particular problems arise which are not covered sufficiently for the
purchaser’s purposes, the matter should be referred to your installing dealer or local distributor.
Note: The manufacturer recommends installing only approved matched indoor and outdoor systems. All of the manufacture’s split
systems are AHRI rated only with TXV/EEV indoor systems. Some of the benefits of installing approved matched indoor and out-
door split systems are maximum efficiency, optimum performance and the best overall system reliability.
4TWX8
Installer’s Guide
Table of Contents
Section 1. Safety ..................................................................................... 2
Section 2. Unit Location Considerations ............................................. 3
Section 3. Unit Preparation.................................................................... 5
Section 4. Setting the Unit ..................................................................... 5
Section 5. Refrigerant Line Considerations ......................................... 6
Section 6. Refrigerant Line Routing ..................................................... 8
Section 7. Refrigerant Line Brazing ...................................................... 9
Section 8. Refrigerant Line Leak Check ............................................. 11
Section 9. Evacuation .......................................................................... 12
Section 10. Service Valves .................................................................. 12
Section 11. Electrical - Low Voltage ................................................... 13
Section 12. Electrical - High Voltage .................................................. 15
Section 13. Start Up.............................................................................. 16
Section 14. System Charge Adjustment............................................. 17
Section 15. Checkout Procedures and Troubleshooting .................. 23
Question and Answer IconNeed help?

Do you have a question about the Trane 4TWX8 and is the answer not in the manual?

Summary

Section 1: Safety

Section 2: Unit Location Considerations

Unit Dimensions and Weight

Details the physical dimensions and estimated weights for different condensing unit models.

Refrigerant Piping Limits

Specifies maximum total length and vertical change allowed for refrigerant lines.

Suggested Locations for Best Reliability

Provides guidance on unit placement for optimal airflow, noise reduction, and avoiding weather impacts.

Cold Climate Considerations

Recommends precautions for units installed in areas with snow and freezing temperatures.

Coastal Considerations

Advises on protective measures for units installed near salt water environments.

Section 3: Unit Preparation

Prepare The Unit For Installation

Outlines steps to check for damage and safely remove the unit from its pallet.

Section 4: Setting the Unit

Pad Installation

Details requirements for installing the unit on a support pad, including size, levelness, and code compliance.

Section 5: Refrigerant Line Considerations

Refrigerant Line and Service Valve Connection Sizes

Presents a table specifying line sizes and service valve connection sizes for different models.

Factory Charge

Explains the factory charge for the condensing unit and connecting lines, emphasizing verification.

Required Refrigerant Line Length

Instructs on determining the required total line length and vertical change for system configuration.

Refrigerant Line Insulation

Emphasizes the importance of insulating the vapor line and preventing contact between lines.

Reuse Existing Refrigerant Lines

Provides precautions for using existing refrigerant lines, focusing on brazing and line condition.

Section 6: Refrigerant Line Routing

Precautions

Details best practices for routing refrigerant lines to prevent noise and ensure proper installation.

Section 7: Refrigerant Line Brazing

Braze The Refrigerant Lines

Provides a step-by-step guide for the proper brazing process of refrigerant lines.

Section 8: Refrigerant Line Leak Check

Check For Leaks

Details the procedure for pressurizing lines with nitrogen and checking for leaks using soapy solution.

Section 9: Evacuation

Evacuate the Refrigerant Lines and Indoor Coil

Explains the process of evacuating the system to a specific micron level using a vacuum pump and micron gauge.

Section 10: Service Valves

Open the Gas Service Valve

Guides on how to properly open the gas service valve after leak check and evacuation.

Open the Liquid Service Valve

Provides instructions and warnings for opening the liquid service valve, emphasizing caution.

Section 11: Electrical - Low Voltage

Low Voltage Maximum Wire Length

Presents a table defining maximum lengths for low voltage wiring based on wire gauge.

Low Voltage Hook-up Diagrams

Illustrates wiring connections for thermostats, air handlers, and outdoor units for different control systems.

Defrost Control

Explains the defrost control settings, termination temperatures, and checkout procedures.

Section 12: Electrical - High Voltage

High Voltage Power Supply

Emphasizes ensuring high voltage power supply matches equipment nameplate and complies with codes.

High Voltage Disconnect Switch

Recommends installing a separate disconnect switch and using flexible conduit for high voltage connections.

High Voltage Ground

States the requirement to ground the outdoor unit according to national, state, and local codes.

Section 13: Start Up

System Start Up

Details the step-by-step procedure for safely starting up the installed system, including waiting periods.

Section 14: System Charge Adjustment

Temperature Measurements

Explains the necessity of measuring outdoor and indoor temperatures for accurate system charging.

Subcooling Charging in Cooling (Above 55° F Outdoor Temp.)

Provides charts and steps for adjusting system charge using subcooling for outdoor temps above 55°F.

Subcooling Charging Below 55° F Outdoor Temp. (In Heating Only)

Recommends weighing the charge in heating mode for outdoor temps below 55°F, referencing pressure curves.

Section 15: Checkout Procedures and Troubleshooting

Operational And Checkout Procedures

Lists essential checks and procedures to ensure proper system operation and performance post-installation.

Troubleshooting

Offers a fault guide correlating system faults with potential causes for refrigerant and electrical issues.

Overview

This document serves as an installer's guide for Trane Condensing Units, specifically the 4TWX8 series. It provides comprehensive instructions for the proper installation, setup, and maintenance of these outdoor units, emphasizing compliance with national, state, and local codes. The guide is intended for individuals with adequate electrical and mechanical experience, as improper installation or servicing can lead to personal injury or property damage.

Function Description:

The Trane 4TWX8 series condensing units are outdoor components of a split-system air conditioning or heat pump system. Their primary function is to facilitate the heat exchange process, working in conjunction with an indoor evaporative coil to cool or heat a building's interior. These units are designed to operate with R-410A refrigerant, which requires specific handling procedures due to its higher operating pressures compared to R-22. The manufacturer strongly recommends installing only approved matched indoor and outdoor systems to ensure maximum efficiency, optimum performance, and overall system reliability. The units are factory charged with the system charge required for the outdoor condensing unit, ten feet of tested connecting line, and the smallest rated indoor evaporative coil match.

Usage Features:

The installation process begins with unit preparation, including checking for shipping damage and carefully removing the unit from its pallet. Proper unit placement is crucial for optimal performance and longevity. The guide outlines several considerations for unit location, such as ensuring adequate clearance around the unit for unrestricted airflow and service access. For instance, a minimum of five feet of unrestricted space above the top discharge area and three feet in front of the control box (access panels) is required. The unit should also be positioned at least 12 inches from any wall or surrounding shrubbery. To prevent noise and vibration transmission, the guide advises against installing the unit near bedrooms or living areas where condensation and freezing defrost vapor might annoy occupants. When mounting on a roof, the structure must be capable of supporting the unit's weight, and proper isolation is recommended to alleviate sound or vibration transmission.

Refrigerant piping limits are detailed, specifying a maximum total line length of 150 feet (including lift) and a maximum vertical change of 50 feet. Specific line sizes and service valve connection sizes are provided for different models, with exceptions for certain tonnages. The guide emphasizes the importance of insulating the vapor line and preventing direct metal-to-metal contact between the liquid and vapor lines. For retrofit applications using existing refrigerant lines, it is crucial to ensure all joints are brazed (not soldered) and that the lines are free of leaks, acid, and oil.

Refrigerant line routing precautions are outlined to prevent noise transmission within the building structure. This includes using isolation hangers when fastening lines to joists or framing, insulating and isolating lines running through walls or sills, isolating lines from ductwork, and minimizing 90-degree turns.

The brazing process for refrigerant lines is meticulously described, starting with deburring and cleaning pipe ends. It involves removing pressure tap caps and valve cores from service valves, purging lines with dry nitrogen, and wrapping wet rags around valve bodies to prevent heat damage during brazing. For units with field-installed external driers, the directional flow arrow must be confirmed before brazing the drier into the liquid line. After brazing, a leak check is performed by pressurizing the lines and evaporator coil with dry nitrogen to 150 PSIG and checking for leaks with a soapy solution. Any leaks must be repaired before proceeding.

Evacuation of the refrigerant lines and indoor coil is a critical step, requiring evacuation until a micron gauge reads no higher than 350 microns. The system is considered properly evacuated if the micron gauge does not rise above 500 microns in one minute after closing off the valve to the vacuum pump.

Opening the service valves is done after leak checking and evacuation are complete. The gas service valve is opened 1/4 turn counterclockwise to its fully open position, and the liquid line service valve is opened counterclockwise until the valve stem just touches the rolled edge (approximately five turns). Valve stem caps must be replaced and tightened to prevent leaks.

Electrical connections are detailed for both low and high voltage. Maximum wire lengths for low voltage wiring are provided based on wire gauge. Low voltage hook-up diagrams are included for different air handler models (TEM 6/8 and TAM 7/9). High voltage power supply must match the equipment nameplate, and power wiring must comply with national, state, and local codes. A separate disconnect switch must be installed at the outdoor unit, and flexible electrical conduit is recommended for high voltage connections to prevent vibration transmission. The outdoor unit must be grounded according to applicable codes.

System startup procedures include ensuring all previous installation steps are completed, setting the system thermostat to OFF, and applying power to the indoor and outdoor units. If a compressor crankcase heater accessory is used and the outdoor ambient temperature is below 70°F, a one-hour waiting period is required before starting the unit.

Maintenance Features:

The guide provides instructions for system charge adjustment, which is crucial for optimal performance. Subcooling charging in cooling mode is the recommended method for outdoor temperatures above 55°F. This involves determining the required line length and lift, calculating the final subcooling value using provided charts, measuring the liquid line temperature and pressure, and comparing these values to a refrigerant charging chart. Refrigerant is added or recovered as needed to achieve the proper liquid gauge pressure. The system must be stabilized by operating for a minimum of 20 minutes before making accurate measurements.

For outdoor temperatures below 55°F (heating mode only), the weigh-in method is recommended for charging. This involves calculating the additional charge needed based on the total line length and a charge multiplier.

Defrost control features are also discussed. The units have selectable termination temperatures for defrost cycles, with a default of 47°F. Jumper J2 can be cut to achieve a 70°F termination temperature when the ambient temperature is at or below 30°F. Pin identification for the defrost board allows for testing and forced defrost initiation. Normal operation of the defrost control requires the LED to flash once per second, 24V AC between R & B, and 24V AC between Y & B with the unit operating.

Finally, the guide includes a comprehensive checkout procedure to ensure proper operation after installation. This involves verifying refrigerant line integrity, insulation, and security, sealing passages through masonry, checking electrical connections, observing outdoor fan operation, ensuring free drainage of the indoor coil, confirming open and unobstructed supply registers and return grilles, verifying the return air filter installation, and checking the correct airflow setting for the indoor blower motor. The entire system should be operated in each mode to ensure safe operation. A troubleshooting section with a system faults table helps diagnose common issues related to the refrigerant circuit, electrical components, and defrost system. This table categorizes faults by primary and secondary causes, aiding in efficient problem resolution.

Trane 4TWX8 Specifications

General IconGeneral
Model Number4TWX8
CategoryHeat Pump
HSPF RatingUp to 10
RefrigerantR-410A
Warranty10 year limited warranty on compressor

Related product manuals