EasyManua.ls Logo

Trane 824 Comfort Control - System Setup; Power-Up Sequence

Trane 824 Comfort Control
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Guide
page 20 18-HD72D1-1
5. System Setup
5.1 Power-Up Sequence
When the 824 Control is connected to the Sub-base, the
Control will initiate a 90-120 second power-up sequence.
During the power-up sequence, the Screen Calibration
option is available for five seconds. If the screen is not
pressed within five seconds, the Control will default to
previously stored Screen Calibration settings.
Note: The 824 Control is factory calibrated and can be
recalibrated at any time by rebooting the Control and
selecting Screen Calibration option within the five seconds
following power-up.
Diagram 27 - Package Single or Multi-Stage Dual Fuel w/Variable Speed Blower
AUX 2
AUX 1
24VAC HOT
COMMON
SOV
COOLING
FA N
HEATING
ODT
RS
AUX2
AUX2
AUX1
AUX1
RC
RH
B/C
O
Y1
Y2 Y2
G
BK
W1
W2
G
BK
W1
W2/X2
W3
ODT
ODT
RS1
RS1
O
R
B
Y
27- Package Single or Multi-Stage Dual Fuel with Variable Speed Blower
OUTDOOR UNIT
NOTES:
1. Cut and remove the factory installed “BK” jumper on
them ECM fan control board
2. ”BK” is not connected on non-Trane/American
Standard units
3. For restricted mode operation, a wired ODT sensor
must be connected to the 824
Optional
Outdoor
Sensor
Optional
Remote
Sensor
1
1

Related product manuals