EasyManua.ls Logo

Trane CCUF - Installation Procedures; Moving and Positioning the Unit

Trane CCUF
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 10
4 INSTALLATION
4.1
MOVING AND POSITIONING THE UNIT
The units have been designed to be lifted from above by means of eyebolts and holes in the base
members. Use retractor bars to keep the lifting wires or chains away from the unit.
Figure 2 - Correct lifting procedure for platform 1 units
(sizes from 050 to 085)
Figure 3 - Correct lifting procedure for platform 2 units (sizes
from 100 to 210)

Related product manuals