EasyManuals Logo

Trane CVRD User Manual

Trane CVRD
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
Mounting
AFDK-SVU01C-EN 25
4. Attach floor mounting rails to the bottom of the
enclosure.
5. Install anchors in floor.
6. Carefully lift the drive into place. Do not bump or jolt
th
e drive while lifting. Refer to “Lifting Procedure,”
p. 22.
7. Secure the floor mou
nting rails to the floor using lag
screws and washers.
8. Install and connect one of the cooling systems
desc
ribed in “Plumbing,” p. 26.
9. Connect power, ground, and control wiring
connections. Refer t
o “Input Power and Control
Wiring,” p. 34.

Other manuals for Trane CVRD

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane CVRD and is the answer not in the manual?

Trane CVRD Specifications

General IconGeneral
BrandTrane
ModelCVRD
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals