EasyManua.ls Logo

Trane Horizon OABD108 Series - Rigging Diagrams

Trane Horizon OABD108 Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unit Weight and Rigging
OAU-SVX005C-EN 17
Rigging
Before proceeding, refer to Table 1, p. 16 for typical unit
operating weights and Figure 7, p. 17 for rigging drawing.
1. Rig the unit as shown in Figure 7, p. 17. Attach
adequate strength lifting slings to all four lifting
brackets in the unit base rail. Do not use cables, chains,
or slings except as shown.
2. Install a lifting bar, as shown in Figure 7, p. 17, to
protect the unit and to facilitate a uniform lift. The
minimum distance between the lifting hook and the
top of the unit should be 7 feet.
3. Test-lift the unit to ensure it is properly rigged and
balanced, make any necessary rigging adjustments.
4. Lift the unit and position it into place. Remove fork
pockets prior to setting on the curb.
5. Downflow units; align the base rail of the unit with the
curb rail while lowering the unit onto the curb. Make
sure that the gasket on the curb is not damaged while
positioning the unit.
Figure 7. Rigging
A
DETAIL A
SCALE 1 : 12
SCREW PIN SHACKLE
4 LOCATIONS
SPREADER BARS
6-point lift
(Model: Direct-fired OAB)
SPREADER
BARS
A
SCALE 1 : 12
DETAIL A
SCREW PIN SHACKLE
4 LOCATIONS
KCC
International Inc.
4-point lift
(Model: Direct-fired OAG)

Table of Contents

Related product manuals