40 LPC-SVX01C-EN
installation
procedure
Installation
Attaching optional sections to
the model LPC
Note: Gasketing is not required on this
equipment. The Packaged Climate
Changer was designed and tested to be
used without gasketing.
Note: All screws, nuts, & bolts required for
installation are field-provided.
Step 1.
Connect modules to flange on top of unit.
Step 2.
Use the flange on both sides of the unit to
connect modules.
main unit