EasyManua.ls Logo

Trane Odyssey TWA2404 D Series - Electrical Wiring Preparation

Trane Odyssey TWA2404 D Series
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SSP-SVX001B-EN
9
Inspect unit location for proper free air clearances.
Inspect unit location for secure, level mounting
position.
Verify condenser fans turn freely without rubbing
and are properly tightened on the shafts.
Refrigerant Piping
Properly sized/constructed liquid and suction lines
connected to stubs at both the indoor and outdoor
units?
Insulated the entire suction line?
Insulated portions of liquid line exposed to
extremes in temperature?
Performed initial leak test?
Evacuated each refrigerant circuit to 500 microns?
Charged each circuit with proper amount of R-410A/
R-22?
Electrical Wiring
Provided unit power wiring (with disconnect) to
proper terminals in the unit control enclosure?
Installed system indoor thermostat or zone sensor?
Installed system low voltage interconnecting wiring
to proper terminals of outdoor unit, indoor unit and
system thermostat or zone sensor?
Checked all electrical connections to verify all are
properly tightened and connected?
Verified operation of crankcase heaters?
PPrree--IInnssttaallllaattiioonn

Related product manuals