24 SS-SVX006C-EN
Startup and Commissioning
Operation
For new installations, ensure the unit is ready to operate
by going through the Checklist for Completed Installation,
located in Appendix A, prior to start-up.
Note: A Wa
rranty Registra
tion and Start-Up Checklist is
provided with the unit data package. It should be
completed during start-up and sent to Trane. This
checklist should be used as a guideline for items
that need to be confirmed during start-up.
Test cooling operation by adjusting the temperature
setpoint at
th
e system controller. The compressor should
come on and the suction line temperature should
gradually drop.
Ensure the fan(s) are rotating correctly and freely without
an
y unusu
al noise.
Note: Start-u
p mu
st be performed by a qualified
journeyman, refrigeration mechanic or an air
conditioning technician. Refer to the separate
controller operation instructions sent in the data
package with your unit.
Operational Description
When used with a Trane indoor evaporator unit, the A/C
system compressor starts then the condenser fan(s) start.
Operation of the condenser fans is dependent on the head
pressure control method used.
Remote air-cooled condensers may
be configured for
stan
d-alone operation. In this case the fans begin
operating when power is turned on.
Refrigerant flowing from the evaporator
in the form of a
low pressure gas, enters the compressor where it is
compressed into a high temperature, high pressure gas.