Appendix A
Installation Checklist
Table 11. Installation checklist
Y/N Tasks Comments
Proper clearances for service access have been maintained around equipment.
Equipment is level and mounting fasteners are tight.
If required, piping completed to r
efriger
ant or coolant loop.
All field installed piping leak tested.
If required, refrigerant charge added.
Condensate drain line connected with P-trap and i
s filled with water.
If re
quired, water supply line connected to humidifier (if required).
If manual cut-off valve is installed, open valve.
Humidifier On/Off/Drain switch is in the on position.
Filter(s) installed.
Duct plenums sealed.
Incoming line voltage matches equipment nominal nameplated rating ±
to
lera
nces.
Main power wiring connections to the equipment, including earth ground, have
been pr
operly installed.
Customer supplied main power circuit breaker (HACR type) or fuses have proper
ratings for e
quipment installed.
All wiring connections are tight.
If required, control wiring connections completed to field mounted sensors.
Foreign materials have been removed from inside and around all equipment
installed (shipp
ing materials, construction materials, tools, etc.).
Inspect all piping connections for leaks dur
ing initial operation.