EasyManua.ls Logo

Trane UD080R9V3K Series - User Manual

Trane UD080R9V3K Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Variable Speed, 2-Stage
Upflow / Horizontal and Downflow / Horizontal,
Gas-Fired Furnaces, “Fan Assisted
Combustion System”
A341789P03
Installer’s Guide
Downflow / Horizontal* Upflow / Horizontal*
For VENT SIZING INFORMATION see:
USA —
National Fuel Gas Code ......... ANSI Z223.1/NFPA 54 (latest version)
CANADA —
Natural Gas Installation Code ...... CAN/CGA-B149.1 (latest version)
Propane Installation Code ............. CAN/CGA-B149.2 (latest version)
USA/CANADA ALTERNATE —
Category I Venting Guide ......... Pub. No. 18-CH23D1 (latest version)
*Horizontal Conversion for these furnaces may be left or right side rotation.
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT This Document is customer property and is to remain with this unit.
Please return to service information pack upon completion of work.
*__First letter may be “A” or “T”
18- CD20D1- 18
AVAILABLE IN FRENCH CANADIAN (FC)
*UD060R9V3K
*UD080R9V3K
*UD080R9V4K
*UD100R9V3K
*UD100R9V5K
*UD120R9V5K
*UD140R9V5K
*DD060R9V3F
*DD080R9V3F
*DD100R9V5F
*DD120R9V5F

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane UD080R9V3K Series and is the answer not in the manual?

Trane UD080R9V3K Series Specifications

General IconGeneral
SeriesUD080R9V3K
Model NumberUD080R9V3K
CategoryFurnace
Fuel TypeNatural Gas
Input BTU80, 000
Output BTU64, 000
AFUE80%
ConfigurationUpflow/Horizontal
Blower MotorPSC
Ignition TypeHot Surface Ignition
Heat Exchanger MaterialAluminized Steel
Vent Diameter4 inches
StagesSingle-stage

Summary

SAFETY SECTION

CARBON MONOXIDE POISONING HAZARD

Critical safety warning about carbon monoxide risks during operation and testing.

FIRE OR EXPLOSION HAZARD

Warning about potential fire and explosion risks due to improper handling or servicing.

GENERAL INSTALLATION INSTRUCTIONS

AIR FOR COMBUSTION AND VENTILATION

DUCT CONNECTIONS

RETURN AIR FILTERS

GENERAL VENTING INSTRUCTIONS

VENT PIPING

MASONRY CHIMNEY VENTING

EXTERNAL MASONRY CHIMNEY

ELECTRICAL CONNECTIONS

GAS PIPING

COMBUSTION AND INPUT CHECK

HIGH ALTITUDE DERATE

START UP AND ADJUSTMENT

PRELIMINARY INSPECTIONS

Checks to perform before initial unit start-up, ensuring proper assembly and connections.

LIGHTING INSTRUCTIONS

Procedures for safely lighting the furnace burners and verifying operation.

SEQUENCE OF OPERATION

CONTROL AND SAFETY SWITCH ADJUSTMENT

ABNORMAL CONDITIONS

INTEGRATED FURNACE CONTROL ERROR FLASH CODES

Related product manuals