EasyManua.ls Logo

Trebor Mega 960D - Dry Pump; Dry Suction

Trebor Mega 960D
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 24 MEGA 960D PUMP OPERATION / MAINTENANCE MANUAL
• Check for fluid leaks, listen for air leaks, check for irregularity
• Close the discharge valve and deadhead for 2 minutes
• Pump must not experience jog, erratic cycling or leaks
• Open discharge valve and expel the remaining DI water
• Prepare the pump for drying
4.9.b Dry Pump
• Connect vacuum hose to discharge line
• Connect purge line to fluid inlet
• 60 psig Supply Pressure
• Cycle pump & vacuum dry by rotating pump side to side for 30 seconds.
• Turn off Air Supply and allow the pump to purge for 5 minutes.
4.9.c Dry Suction
• 20 psig Supply Pressure Target
• Record Suction Value
• Target = 14 in-Hg.