PAGE 24 MEGA 960D PUMP OPERATION / MAINTENANCE MANUAL
Check for fluid leaks, listen for air leaks, check for irregularity
Close the discharge valve and deadhead for 2 minutes
Pump must not experience jog, erratic cycling or leaks
Open discharge valve and expel the remaining DI water
Prepare the pump for drying
4.9.b Dry Pump
Connect vacuum hose to discharge line
Connect purge line to fluid inlet
60 psig Supply Pressure
Cycle pump & vacuum dry by rotating pump side to side for 30 seconds.
Turn off Air Supply and allow the pump to purge for 5 minutes.
4.9.c Dry Suction
20 psig Supply Pressure Target
Record Suction Value
Target = 14 in-Hg.