PAGE 30 MEGA 960D PUMP OPERATION / MAINTENANCE MANUAL
6) Align discharge sleeve (L0196-01) using check sleeve alignment tool (T0229)
as shown.
7) Install check sleeve plug (L0227) into discharge sleeve (L0196-01) using ½”
pin tool (T0148) and drive extension (T0182) as shown.
8) Torque check sleeve plug (L0227) to 35 in-lbs.
9) Install check port seal (L0163-01) and check cap (L0154-01) as shown.
10) Torque check cap (L0154-01) to 60 in-lbs.