EasyManua.ls Logo

Trek SUPERCALIBER SL - Frame Guards; Rotor and Chainring Strike Guards; Chainstay and Downtube Guards; Adhesive Guard Application

Trek SUPERCALIBER SL
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2024 Supercaliber
11
Frame guards
1
2
3
4
1
Rotor strike guard, bonded — W5307943
2
Chainstay guard, adhesive — W5307370
3
Chainring strike guard, bonded — W5307942
4
Downtube protector, clear adhesive — W5312789
Adhesive guards
2
4
Use isopropyl alcohol to clean the frame surface where the
guards attach. Wait for the alcohol to dry before applying
the guards.
NOTICE: Do not clean the entire frame with isopropyl
alcohol. Isopropyl alcohol could damage the paint.
Bonded strike guards
1
3
1. To improve adhesion, use sandpaper to roughen the
backside of the guards and/or remove remnants of
the old guard from the areas of the frame where epoxy
will be applied.
2. Attach the guards with a two-part epoxy.
3. Allow the guards and epoxy to cure for 24 hours.

Related product manuals