Introduction
2
Introduction
This guide is to be used in conjunction with the Triangle Tube PRESTIGE Boiler Installation and Maintenance Manual.
Good Troubleshooting Practices
Before leaving for the job site:
Check your parts and tools
• Test equipment and tools you will need:
Electrical meter that tests both voltage (AC/DC), continuity (ØW), resistance ( W,ohms), and frequency (Hz)
Temperature gauge or metering device
Manometer
Calibrated Combustion Analyzer
Standard tools of the trade (wrenches, screwdrivers...)
• Parts to solve most problems
Control module
Transformer with surge protection
Blower with gasket
PS 399 Parts Case - PSRKIT102
PS 60-250 Parts Case - PSRKIT103
Review all appropriate manuals before leaving for the job site
At the job site:
- Clarify problem
- Have the PRESTIGE manual and any other wiring, zone control or piping diagrams, or installation guides readily
available.
REMEMBER
Follow the Troubleshooting Guide step by step, always double checking your results. Skipping steps or not complet-
ing steps can lead to wrong conclusions, repeated visits to the job site, unhappy customers and unnecessary warran-
ty claims.