Table of Contents
1.0 Installation Instructions ………………………………………………………………………………… Page 2
1.1 Unpacking and Installation
1.1.1 Unpacking and Initial Inspection
1.1.2 Handling
1.1.3 RPDU Preparation
1.1.4 Location Considerations
1.2 Power and Control Wiring
1.2.1 Input Power Connections
1.2.2 Output Power Connections
2.0 Equipment Inspection and Start-Up …………………………………………………………………. Page 10
2.1 Internal Inspection
2.2 Start-Up
3.0 Inspection and Start-Up Checklist …………………………………………………………………… Page 12
3.1 Inspection
3.2 Start-Up
3.3 Monitoring System Check Out
3.4 Equipment Connection Check Out (For Units With Distribution Cables)
4.0 Operating Instructions …………………………………………………………………………………. Page 14
4.1 Start-Up Procedures
4.1.1 Emergency Shutdown
4.1.2 Normal System Shutdown
4.1.3 Normal System Start-Up
4.2 Units Without Monitoring
4.3 Power Monitor Panel
5.0 Corrective Maintenance (Repair) ………………………………………………………………………. Page 15
5.1 Preventive Maintenance (Inspection & Cleaning)