EasyManuals Logo

TRIMOS V300+ User Manual

TRIMOS V300+
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
TRIMOS SA Av. de Longemalle 5 CH 1020 Renens Switzerland
Tel ++ 41 21 633 01 01 Fax ++41 21 633 01 02 office@trimos.ch http://www.trimos.ch
Page 8
6. Unpacking and installation
The V300, V600 and V1000 are supplied in a shock prof box.
The instrument itseff is surrounded with a protection cover.
- To unpack the instrument lay the box in a horizontal position,
Brand name visible on top, open it and take the instrument out carefully.
- Take off the protection cover.
- Insert the ruby ball (V-1).
- Unlock completely the transport safety screw (9), Screw, chromium-plated.
- Clean the instrument, especially the three point air bearings on the base.
DO NOT USE CHEMICAL PRODUCTS.
- Place the instrument on a granite surface table.
FOR FUTURE TRANSPORT KEEP THE ORIGINAL PACKING.
V.RE300/600/1000
V.REC300 (V300)
V.REC600 (V600)
V.REC1000 (V1000)
V.CA300 (V300)
TVA.CA600 (V600)
V.CA1000 (V1000)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TRIMOS V300+ and is the answer not in the manual?

TRIMOS V300+ Specifications

General IconGeneral
BrandTRIMOS
ModelV300+
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals