EasyManua.ls Logo

Trinity Highway MPS 350X - Page 15

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.trin
11.
A
T
t
o
p
12.
C
g
w
f
r
C
13.
P
W
(
s
P
t
h
S
o
ityhighway.
c
B. This
rails.
for t
h
Low
e
to th
e
C. Soc
k
Con
t
parti
c
Imp
o
A
WS
A
fter the M
P
T
urnbuckles.
o
330 mm) f
r
osition on t
h
C
onnect the
W
round cond
u
w
elding cabl
e
r
om the truc
C
ontrols. Tri
n
Caut
i
batte
r
truck
P
ush and h
o
W
inch Strap.
s
ee Figures
P
osition the
W
h
rough the
C
S
ecure by in
s
ut the ends
c
om
option invo
Welding o
n
h
e Lower B
u
e
r Bumper
C
e
truck fram
e
k
et Hitch Op
t
act Trinity
H
c
ular applic
a
o
rtant:
A
ll
w
D1.1. Disco
P
S 350
®
X i
The botto
m
r
om the gro
u
h
e TM
A
for l
a
W
inch by ro
u
ctors) fro
m
e
quick-dis
c
k and enab
n
ity Highwa
y
i
on:
For o
v
r
y should b
e
b
attery.
o
ld the DO
W
Un-spool t
h
12 and 1
3
W
inch Stra
p
C
ross Bar
T
s
erting the
C
of the cotte
r
1
lves weldin
g
n
the “C” Ch
a
u
mper Cros
C
ross Mem
b
e
rails.
t
ion (see p.
3
H
ighway to
a
tion (see p.
w
elding mu
s
nnect truck
s mounted
m
edge of th
e
u
nd (see Fi
g
a
ter use (se
e
uting two (2
)
m
the charg
e
c
onnect allo
w
l
es easy ro
u
y
can provid
e
v
e
r
-current
e
protected
w
W
N button o
h
e Winch S
t
3
). Remove
p
between t
h
T
abs and th
e
C
otter Pin i
n
r
pin.
4
g
the MPS
a
nnel supp
o
s Membe
r
.
b
er extendin
3
7 and 38).
discuss a
n
3).
s
t be perfor
m
battery prio
r
to the truc
k
e
Impact F
a
g
ure 12). Ro
e
Figure 2
o
Figure 11
)
2 AWG (m
e
d truck bat
w
s easy at
t
u
ting of the
c
e
optional C
a
protection,
t
w
ith a 200
a
n the unit's
t
rap until it i
s
the 1” (25
h
e two Cros
e
loop on t
h
n
to the hole
350
®
X Bu
m
o
rt(s) provid
e
Adequate
b
g forward a
n
y special
m
m
ed by a w
r
to welding.
k
, adjust th
e
a
ce should
m
tate or swiv
e
o
n p. 7).
ax 15’ in le
n
t
tery to the
t
achment a
n
c
ables. Co
n
able Kits in
t
he positive
a
mp fuse or
rocker swi
t
s
long enou
g
mm) diam
e
s Bar Tabs
.
h
e end of th
in the 1” (
2
Tur
n
11
Revision
C
m
per directl
e
s the requi
r
b
racing sho
u
a
s far as po
s
m
ounting r
e
elder certifi
e
e
Impact F
a
m
easure be
t
e
l Jacks int
o
n
gth) batter
y
back of the
n
d removal
n
firm operati
15’, 20’, or
2
cable lead
circuit bre
a
t
ch while h
o
gh to attac
h
e
ter Pin fro
.
Insert 1 (
2
e Winch St
r
2
5 mm) dia
m
n
Buckles
to 13" [280
t
C
Decembe
r
y to the tru
r
ed structur
a
u
ld be weld
e
s
sible for at
t
e
quirements
e
d by AWS
a
ce height
u
t
ween 11 to
o
storage (h
o
y
cables (po
s
truck. The
of the MP
S
on of the
W
2
5’ lengths.
coming off
a
ker within 1
o
lding the e
n
h
to the Cro
s
m the Win
c
2
5 mm) dia
m
r
ap (see ne
x
m
eter Pin a
n
Impact F
a
t
o 330 mm]
2017
ck frame
a
l support
e
d to the
t
achment
for your
D14.3 or
u
sing the
13” (280
o
rizontal)
s
itive and
use of a
S
350
®
X
W
inch and
the truck
8” of the
n
d of the
s
s Frame
c
h Strap.
m
eter Pin
x
t page).
n
d flaring
a
ce