EasyManua.ls Logo

Triton Bewitch - User Manual

Triton Bewitch
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installers please note these InstructIons are to be left wIth the user
2180423H March 2009
Installation and
operating
instructions
Bewitch
electric shower
Question and Answer IconNeed help?

Do you have a question about the Triton Bewitch and is the answer not in the manual?

Summary

Important Safety Information

General Safety Precautions

Key safety advice for general shower operation and handling.

Plumbing Safety Guidelines

Essential safety rules for water connections and plumbing installations.

Electrical Safety Requirements

Critical safety measures for electrical installation and safe use.

Electrical Requirements

Earthing and Supply Requirements

Mandatory earthing and power supply connection guidelines.

Circuit Protection and Cabling

Details on MCBs, RCDs, and main switch ratings.

Electrical Cable Guidance

Cable Sizing and Derating Factors

Guidance on selecting correct cable sizes considering derating factors.

Water Requirements

Water Pressure and Flow Rate Needs

Minimum and maximum water pressure and flow rate specifications.

Shower Siting and Mounting

Fitting the Shower to the Wall

Wall Fitting Continuation

Plumbing Connections

Electrical Connections

Commissioning Procedure

Initial Unit Setup and Flushing

Steps for initial setup, including fitting the cover temporarily.

Commissioning Continuation

Operating the Shower

Shower Temperature Adjustment

Troubleshooting Guide

Common Shower Problems and Solutions

Guide to diagnosing and resolving typical shower faults.

Summary

Important Safety Information

General Safety Precautions

Key safety advice for general shower operation and handling.

Plumbing Safety Guidelines

Essential safety rules for water connections and plumbing installations.

Electrical Safety Requirements

Critical safety measures for electrical installation and safe use.

Electrical Requirements

Earthing and Supply Requirements

Mandatory earthing and power supply connection guidelines.

Circuit Protection and Cabling

Details on MCBs, RCDs, and main switch ratings.

Electrical Cable Guidance

Cable Sizing and Derating Factors

Guidance on selecting correct cable sizes considering derating factors.

Water Requirements

Water Pressure and Flow Rate Needs

Minimum and maximum water pressure and flow rate specifications.

Shower Siting and Mounting

Fitting the Shower to the Wall

Wall Fitting Continuation

Plumbing Connections

Electrical Connections

Commissioning Procedure

Initial Unit Setup and Flushing

Steps for initial setup, including fitting the cover temporarily.

Commissioning Continuation

Operating the Shower

Shower Temperature Adjustment

Troubleshooting Guide

Common Shower Problems and Solutions

Guide to diagnosing and resolving typical shower faults.

Triton Bewitch Specifications

General IconGeneral
BrandTriton
ModelBewitch
CategoryPlumbing Product
LanguageEnglish

Related product manuals