EasyManua.ls Logo

Tylo STEAM COMMERCIAL User Manual

Tylo STEAM COMMERCIAL
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1609
Art.nr. 2900 4160
Steam Home/Commercial

Other manuals for Tylo STEAM COMMERCIAL

Questions and Answers:

Tylo STEAM COMMERCIAL Specifications

General IconGeneral
BrandTylo
ModelSTEAM COMMERCIAL
CategoryIron
LanguageEnglish

Summary

General Information

Steam Generator Location

Installation must be carried out by an authorized electrician and authorized plumber.

Installation and Maintenance

Floor and Drain Requirements

There must be drainage inside the steam room. The floor should slope down towards the drain.

Ventilation Guidelines

Steam rooms in continuous use require an air exchange rate of 10-20 m³ air per person per hour.

Pipework Installation

Electrical Installation

Power Supply and Wiring

Electrical installation may only be performed by an authorized electrician.

System Configuration and Options

Troubleshooting Guide

Initial Checks and Faults

Basic checks to perform before troubleshooting, including wiring and installation.

Common Faults and Remedies

Lists common faults like no steam or slow warm-up, with suggested remedies.

Diagnostic Tests

Specific tests to diagnose issues with limescale, sensors, and solenoid valves.

Error Code Reference

Details error codes, symptoms, events during error, and relevant comments for diagnosis.

Related product manuals