EasyManua.ls Logo

Vaillant turboMAX plus 2 E Series - Page 12

Vaillant turboMAX plus 2 E Series
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
OPERATION
1
Fig. B.7: Drawing off hot water
Euro B/S 079/0
Obtaining hot water (TURBOmax
Plus only)
On opening a hot water tap (1) at a
supply point (basin, shower, bath,
etc.) the TURBOmax PLus boiler will
automatically operate to deliver hot
water.
On closing the tap the boiler switches
OFF (or continues to operate for cen-
tral heating if required). The pump
and fan will continue to operate for a
short period.
TURBOmax Plus

Other manuals for Vaillant turboMAX plus 2 E Series

Related product manuals