EasyManua.ls Logo

VANLEIGH PINECREST - Required Maintenance Schedule

Default Icon
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PINECREST OWNER’S MANUAL
Maintenance
Item
Procedure to be performed
Maintenance schedules are minimum requirements. Ex-
tended use, extreme temperatures, high humidity or other
extreme conditions will require more frequent mainte-
nance.
Appliances
● ●
Check settings and adjustments per manufacturer’s guide.
●
Make sure burner tubes/vents are clean and unobstructed.
● ●
Clean and sanitize.
Awnings
●
Wash with warm water and mild detergent.
● ●
Clean and lube moving parts with WD-40.
Axles & Suspension
●
Check u-bolts, springs and hangers for damage.
● ●
Check torque — all bolts (see axle manufacturing guide for
specs).
Baggage Doors
● ●
Confirm the doors seal tightly and are not leaking.
● ●
Spray lock tumblers with dry graphite.
Brakes & Wheel
Hubs
●
Check amp draw/shoe wear/adjustment (see manufacturing
guide for specs).
● ●
Lube bearings (as needed).
Electrical System
● ● ●
Check and service batteries.
● ● ●
Test all GFI outlets.
● ●
Service generator (if equipped) per manufacturer’s manual.
Entry Door(s)
● ●
Make sure door atches and locks function properly.
● ●
Lube hinges with light oil or WD-40.
● ●
Adjust screen door and atch.
Entry Steps
● ●
Clean and lubricate with lithium spray.
Exterior Fibergass
and Metal
● ●
Wash with warm water and mild detergent.
●
Apply non-abrasive wax except on decals.
Exterior Moldings
● ●
Inspect seaant for voids/gaps/cracks.
Every Trip
Annually
Monthly
Before/After Storage
Every 3 Months
As Required
Every 6 months
REQUIRED MAINTENANCE SCHEDULE
MAINTENANCE

Table of Contents