Instructions for the installer, maintenance
technician and final user
20
3 INSTALLATION
3.1 Transport and Positionning
DL6OD - DV6OD
DC6OD - DM6OD
For transport and HANDLING of the vendor follow carefully the below
instructions:
Use a transpallet/forklift having a minimun loading capacity of 400 kg., the wooden
base (A) permits to fork the vendor on 4 sides.
If installation is not immediate position the vendor vertically in a dry and covered area.
CAUTION: it is absolutely forbidden to transport and/or position the vendor in a
horizontal position.
If the machine is mistakenly placed in a horizontal position, re-position it again in
working position (vertical) and wait at least12 hours before starting it, otherwise it
would be possible to cause damages or anomalies to the cooling unit.
Place the vendor in the installation area, work with caution, avoid jumps and bumps.
Free the machine from its packing, extract, from the back protection grill, the power
cable and carefully place it in the final position.